← Our work
Bath
Full bathroom renovation
After
Before This bathroom was taken all the way to the studs. Behind the old walls we found aging galvanized plumbing and water damage — so we rebuilt it right: fresh PEX supply lines and a new valve, waterproofed and tiled by our own crew.
The finished room is a full transformation — a crisp white subway-tile tub-and-shower surround with a built-in niche, matte-black fixtures, a gray double vanity with a quartz top, framed mirrors, and durable new flooring. One licensed crew, demo to finish, with the plumbing done in-house.
The full project





